2009 • Hay Gaol Precinct CMP
PREPARATION OF A CMP FOR THE HAY GAOL PRECINCT HAY NSW The Hay Shire Council agreed to the preparation of this Plan in August 2008. The Hay Shire Council provided funding for this Plan with supplementary funding being provided by the NSW Heritage Council.
-

2009 • Heritage Assessment of the Victoria Creek Bridge Dry Stone Wall
HERITAGE ASSESSMENT OF THE VICTORIA CREEK BRIDGE DRY-STONE WALLING RETAINING WALL This Heritage Assessment of the Victoria Creek Bridge dry-stone walling was prepared as a component of a Review of Environmental Factors being prepared by NGH Environmental. The assessment relates specifically to a length of retaining wall, built utilising the dry-stone construction technique, and completed…
-

2009 • Schwarz Residence at Bingie NSW
STUDIO EXTENSION FOR THE TESSA AND PETER SCHWARZ PROPERTY AT BINGIE In 2009 Smith + Freeman Architects were asked to prepare sketch plans for a studio extension for the Tessa and Peter Schwarz property at Bingie, south of Moruya. The project has not proceeded past the sketch plan stage.
-

2009-2010 • Southern Phones Moruya NSW
DESIGN AND OVERSIGHT OF THE NEW SOUTHERN PHONES BUILDING This project involved the design and oversight of the new Southern Phones building in central Moruya in association with Pip Smith. The project was undertaken by Smith + Freeman architects, with construction by South Building. Southern Phones provides communications services to southeast Australia. The design was…
-

2010 • Pacific Street residence Mossy Point NSW
SKETCH DESIGN FOR THE PACIFIC STREET RESIDENCE AT MOSSY POINT NSW This project for the alterations and additions to a cottage in Pacific Street Mossy Point was undertaken by Smith + Freeman architects. The design proposed the addition of a small and modern annexe to an ‘A frame’ beachside cottage.
-

2009-2010 • St Matthias Church Conservation Works Bombala
ST MATTHIAS ANGLICAN CHURCH CONSERVATION WORKS BOMBALA NSW These works were undertaken on the basis of PFCA+P recommendations, as follows:An elevated composite floor should be inserted into the historic Church and the Eastern vestry.A detailed specification of the proposed elevated composite floor should be prepared prior to any works being undertaken; and The existing timber dado should…
-

2009-2010 • Bain Residence Broulee NSW
DESIGN AND OVERSIGHT OF THE BAIN RESIDENCE AT BROULEE NSW This project involved the design and oversight of a new house for Andrew + Lynn Bain at Broulee in association with Pip Smith. The project was undertaken by Smith + Freeman architects, with construction by Smith + Primmer contractors. The design was informed by the…
-

2010 • Goulburn Conservatorium CMP
PREPARATION OF A CONSERVATION MANAGEMENT PLAN FOR THE FORMER GOULBURN TECHNICAL COLLEGE The Goulburn Regional Conservatorium Inc. engaged Allen Grimwood of Zenith Town Planning and Peter Freeman of PFCA+P to prepare a Conservation Management Plan for the former Goulburn Technical College building currently occupied by the Conservatorium. The plan was written jointly, with the assistance…
-

2009-2010 • Moruya Quarry Lathe Interpretation + Exhibition Project
THE ABERNETHY + CO. LATHE EXHIBITION AND INTERPETATION PROJECT There were several quarries flanking the Moruya River. The first quarry was opened in 1863 for the quarrying of sandstone boulders for use in constructing the breakwater at the entrance to Moruya River. This sandstone quarry was site just to the east of the Moruya Heads…
-

2010-2011 • Rosedale Cabins South Rosedale NSW
DESIGN AND OVERSIGHT OF THE ADAPTIVE REUSE OF THE 1930S ROSEDALE CABINS NSW This project involved the design and oversight of the adaptive reuse of the 1930s Rosedale cabins on South Rosedale beach by Smith + Freeman. The construction was by Smith + Primmer contractors. The design was informed by heritage values of the original…